Insights
Gentle patterns from your estimate feedback.
How insights work (tap to expand)Details
Inputs
- Task type (Work, Personal, Admin).
- Planned duration you chose.
- Your check-in: Too Short / About Right / Too Long.
- Only blocks 10 minutes+ are used.
Where check-ins appear
- Enable Estimate training in Settings.
- Shown after you mark a focus block done.
- Appears occasionally (about 30%) and max once per day.
Example
Reading - 30 minutes
Too short = you needed more than 30 minutes.
About right = 30 minutes felt correct.
Too long = 30 minutes was more than you needed.
What it turns into
- Mostly Too Short = "underestimate by ~5-10m".
- Mixed results = "Estimates look steady."
- Fewer than 3 check-ins = "Not enough feedback yet."
Insights are a Pro feature
Upgrade to see estimate patterns by task type.